South Walker Creek – K2 Pit Early Works

BMC

Civil works to enable a pit expansion, including:

  • Clear, grub and topsoil strip
  • Construction of 17.5 km of roads and associated drainage structures

Goonyella Riverside Mine – GS1 Tailings Dam Raise

BMA

Tailings Dam Raise including:

  • Upstream and downstream embankment raises
  • Spillway construction – concrete and reno mattress works
  • HV and LV electrical works
  • HDPE pipeline and discharge spigot works

Goonyella Riverside Mine – Kakadu Dam Split and Lenton Pit Pipeline

BMA

Construction of a 2km dividing embankment to an existing dam, including spillway.

Saraji Mine – Barret’s Creek Levee

BMA

Construction of 1km long Levee, including works in a rail corridor.

Blackwater Mine – Tannyfoil Back Access Road

BMA

Construction of 2.5km of 12m wide, 2 lane road to TMR specification.

Blackwater Mine – Deep Creek Remediation

BMA

Complex environmental remediation project including:

  • modifications to an existing Sediment Dam:
    • removal of silt / sediment;
    • increase capacity;
    • install dividing wall;
    • relocate spillway;
    • modification to decant pipelines.
  • stockpile run-off containment drains and sump system;
  • tailings dam seepage containment levee;
  • clean water diversion drain;
  • access roads to newly constructed infrastructure;
  • HDPE pipeline installations.

Blackwater Mine – Wilpeena Back Access Road

BMA

Construction of 8.5km of 12m wide, 2 lane road through challenging terrain to TMR specification. Included culverts, stabilised pavements, reno mattress and gabion basket works.

Saraji Mine – Hughes Creek Rock Armouring Stages 1-4.

BMA

Re-battering and rock armouring of severely eroded creek banks

Blackwater Mine – Tailings Dam Raise

BMA

Partial raise (upstream and downstream) of existing tailings dam, including tailings discharge pipeline (HDPE) works. RPEQ-certified.

Goonyella Riverside Mine, QLD

BMA

Haul Road maintenance – plant and operator hire for road repairs and maintenance for the whole site.

Saraji Mine, QLD

BMA

Environmental and general earthworks

  • Topsoil Management
  • Dam Construction
  • Dragline Pad Construction
  • Mining & Civil Earthworks

Peak Downs Mine, QLD

BMA

Boomerang Dam – bulk earthworks and de-silting

Peak Downs Mine, QLD

BMA

7 North Dam – de-silting

Peak Downs Mine, QLD

CFC Earthmoving

Topsoil management, dam construction and various bulk earthworks

Lake Vermont Mine, QLD

Thiess

Topsoil management

Goonyella Riverside Mine, QLD

Watpac

Tailings dam raise

Goonyella Riverside Mine, QLD

HMP Constructions

Topsoil management and rehabilitation

South West Transport Corridor, Brisbane

Leighton Contractors

Road construction – bulk earthworks

Karuah to Buladelah (Pacific Highway), NSW

Abigroup

Road construction – bulk earthworks

Wodonga Bypass (Hume Highway), NSW

Abigroup

Road construction – bulk earthworks

Agricultural Works – Central western NSW

Various

Dams, drainage, irrigation infrastructure – bulk earthworks

Penrith Lakes Development, NSW

Penrith Lakes Development Corporation

Urban development – bulk earthworks

Copyright © 2013 CPHMC Pty Ltd