Project Timing: 09/2013– 10/2014
Project Value: $19,261,000
Client details: BHP (Caval Ridge Mine)
CPH was contracted to carry out the vegetation clearing and topsoil stripping required to enable BHP to commence and continue pre-strip operations at Caval Ridge Mine, which was then under construction.
Over the contract duration, CPH:
At the peak of the project, CPH moved 320,00 cubic metres of topsoil per moth over haul distances up to 3.5km, utilizing a fleet of scrapers and articulated dump trucks.